SiBCAS has achieved CLOCS (Construction Logistics and Community Safety) common standard. The CLOCS Standard is a key step to demonstrate the commitment of construction logistics industry organisations to improve road safety throughout the supply chain. Well done to our transport department!
South Tyneside Council
Tailored Modular Buildings for Connah’s Quay High School – Wales
The mobile village provides much needed temporary teaching accommodation during the replacement of the design technology wing of the school. This is part of a project funded by the Welsh Assembly of Wales, 21st Century School scheme. The modular classrooms provide a flexible space for Drama, Music, Art and DT lessons. The client says ‘The accommodation […]
Marlow Foods
FORS Accreditation – SILVER Award for SiBCAS
We are delighted to announce we have successfully achieved FORS (Fleet Operator Recognition Scheme) Silver Accreditation, highlighting our dedication to making roads safer and operating to standards above the legal minimum requirement. We are committed to continual improvement by investing in safety and sustainability. You can rest assured your portable buildings will be delivered Safer, […]
Bonnybridge Primary School
Modular building Specialist SiBCAS install modular nursery at Bonnybridge
SiBCAS supplied and installed a modular solution to provide additional teaching space including; toilets, kitchen area and community room at Bonnybridge Nursery. The school are now able to teach pre-school children in a modern learning environment. Click on the link to read the full case study https://sibcas.co.uk/bonnybridge-primary-school/
Smart Motorways Joint Venture – Costain Galliford Try JV
SiBCAS pull out all the stops to deliver temporary polling stations across the UK
Once again, SiBCAS helps out Local Authorities nationwide, by supplying portable cabins to be used as temporary polling stations in this year’s General Election.
SiBCAS provide modular office and welfare solution to Mace
Mace required offices and welfare facilities to house staff on a temporary basis during construction work on the Greenwich Peninsula Project. Sibcas provided a modular construction solution, using their PermaSpace Modular Buildings, to provide a high quality, 2 storey office complex, made up of 60 modular sections.