SiBCAS were asked to provide mobile project offices and welfare unit facilities for Carillion – one of the UK’s leading construction companies – during the construction of the new multi million pound A1 bypass at Morpeth Whorral Bank site. The mobile offices were to be installed with minimal disturbance to the local area.
The modular buildings had to be installed with careful consideration given to the surrounding neighbourhood. It was essential that disruption was kept to a minimum.
The client was happy with the overall appearance and finish of the modular buildings for this prestigious scheme. The buildings were installed to schedule and disturbance to the local area was kept to a minimum.